Answers from NI 43-101 technical reports, with the page for every figure.

Proxylith answers analysts' questions about NI 43-101 technical reports. Every figure is quoted as printed, with the PDF page it's on, so you can check it.

One question, answered from two filings

Recorded answer, replayed. Figures and pages as the tool returned them, .

Question

How has First Mining's Springpole resource changed between its two pre-feasibility studies, and why?

What the tool did
  1. Listing the filings it can read
  2. Reading the 2021 PFS resource figures (filed 2022-11-02)
  3. Reading the 2025 PFS resource figures (filed 2025-12-22)
  4. Finding the pages the 2021 figures are printed on
  5. Finding the pages the 2025 figures are printed on
  6. Searching the 2025 PFS for its comparison with the previous estimate
  7. Searching the 2021 PFS for Table 14-11 and its cut-off assumptions
  8. Checking the quotes on PDF pp. 219–221 of the 2025 PFS
  9. Checking the price and cut-off quote on PDF p. 31 of the 2025 PFS
  10. Checking the assumptions quote on PDF pp. 184–185 of the 2021 PFS
Answer, shortened

The two pre-feasibility studies (PFS) are the 2021 PFS (filed 2022-11-02) and the 2025 PFS (filed 2025-12-22). The same qualified person, Dr. Gilles Arseneau, signed both resource estimates.

The headline numbers

2021 PFS Table 14-11 PDF p. 185 2025 PFS Table 14-12 PDF p. 216
Cut-off 0.30 g/t Au 0.20 g/t Au
Indicated 151 Mt @ 0.94 g/t Au 4.6 Moz Au 191 Mt @ 0.78 g/t Au 4.8 Moz Au
Inferred 16 Mt @ 0.54 g/t Au 0.3 Moz Au 64 Mt @ 0.38 g/t Au 0.8 Moz Au

Figures found on the cited pages. Silver omitted here for space.

Why it changed

  1. The cut-off grade dropped from 0.30 to 0.20 g/t Au, which caused most of the change. Lowering the cut-off brings in more low-grade material, which adds tonnes and pulls the average grade down. The new cut-off rests on new economic assumptions:

  2. More drilling expanded the Portage zone, which mainly affected the Inferred resource. To compare like with like, the 2025 report re-states the new resource at the old 0.30 g/t cut-off (Table 14-16). The QP concludes:

    “at this cut-off the current resource is similar to the previous mineral resource statement with less than a 6% increase in the Indicated tonnes and a 2% increase in the contained Indicated ounces within the resource shell. The Inferred tonnes have increased by about 156% due mainly to the expansion of the Portage zone as a result of the inclusion of data from subsequent drill programs, which resulted in an increase of about 100% of the contained Inferred gold ounces.”

    PDF p. 220

A wording error in the 2025 report: it says the 2020 resource “was reported at a lower cut-off (0.30 g/t as opposed to 0.20 g/t for the current estimate)” PDF p. 219. 0.30 g/t is the higher cut-off, so “lower” appears to be a typo.

Shortened for this page: the full answer also gives silver, costs and recoveries. The model's own percentage comparisons are left out; the percentages above are the report's.

Each page chip opens a crop of that PDF page.

How it works

  1. Reads the filings

    It works from the NI 43-101 technical reports themselves: the resource tables, the assumptions behind them, and the text around them.

  2. Quotes figures as printed

    Tonnes, grades, prices and cut-offs come from the report as written. When the report's wording contradicts its own tables, the answer says so.

  3. Cites the page

    Each figure carries the PDF page it's printed on: the page number your PDF viewer shows, so you can go straight to it.

About Proxylith

Proxylith Data Inc. builds research intelligence for the people who analyse Canadian mining companies.

The figures behind a mining valuation (resources, grades, cut-offs, metal prices and the assumptions that tie them together) live in long technical reports, and they shift from one report to the next. Proxylith reads those filings and answers questions about them, quoting each figure as printed and citing the page it's on.

The aim is simple: less time hunting through PDFs, more time on the judgement calls, with every number traceable to its source.

Contact

Self-serve access is coming soon. Until then, we offer a 20-minute walkthrough and free prepared answers to your own questions about the reports you cover.

Transcribed as printed. Highlighted: what the answer cites. “…” marks where the excerpt is cut.

Show the original page image